AIMS Attachment A: AIMS Statement of Work
Page 40 of 130
copies of documented quality control operations, inspections and tests
shall be made available to the County at the points of production,
manufacture and/or shipment.
2.4 PROJECT CLOSEOUT
2.4.1 Contract Closeout Procedures
A. "Contract Closeout" is defined to include general requirements near end of
Contract time in preparation for Final Acceptance.
B. CONTRACTOR shall submit record drawings and project manual for
County‟s review a minimum of 30 calendar days prior to Final Acceptance.
Reviewed documents will be returned to CONTRACTOR should additional
information or revisions be required. All completed record documents
shall be turned over to the County prior to Final Acceptance.
C. CONTRACTOR shall submit written certification that work has been
inspected and is complete in accordance with the Contract Documents
and is ready for final inspection.
D. CONTRACTOR shall provide all required deliverables and submittals to
the County.
E. CONTRACTOR shall deliver written guarantees and warranties prepared
in duplicate, and certificates of inspection to the County for its review and
delivery to County‟s records.
F. CONTRACTOR shall demonstrate to the County the operation and
maintenance requirements.
G. CONTRACTOR shall turn over to the County all COUNTY-issued
identification media, including but not limited to Airport vehicle passes,
personal passes, SIDA media, and other identification.
H. CONTRACTOR shall submit one (1) full set of all required deliverables.
2.4.2 Final Cleaning and Adjusting. Prior to Final Acceptance, CONTRACTOR
shall satisfy the following requirements:
A. General cleaning during progress of work is specified elsewhere. Provide
final cleaning of the work consisting of cleaning the work and staging
areas to normal “clean” condition, which allows use of the work, installed
without additional cleaning. The following are examples, but not by way of
limitation, of cleaning levels required:
1. Clean work and staging areas of litter and foreign objects/substances.
Sweep paved areas to a broom-clean condition.