
AIMS Attachment A: AIMS Statement of Work
Page 12 of 130
1.6.2 Phase One
Provide Submittals associated with Phase One,
including the following:
Review against
specifications
Provide finalized system, equipment, and
component submittals
Review against
specifications
Provide finalized products list
Review against
specifications and
requirements
Provide finalized system environmental
requirements
Review against T4 1B
requirements
Provide finalized Interface Design Documents
(IDDs) for each identified interface/integration.
For DAPP and CUSS, IDDs are required for
stage one airlines only.
Review against
specifications
Provide finalized display formats for each
functional display
County Preliminary
Acceptance
Provide finalized database structure and schema
documentation
Review against
specifications
Provide finalized set of all software
documentation and utilities
Review against
specifications
Provide finalized system administration
documentation
Review against
specifications
Complete County/tenant workshops (as listed)
including development, coordination,
administration, and documentation
County Preliminary
Acceptance
Complete EVIDS distribution architecture and
display driving workshop
County Preliminary
Acceptance
Complete screen formats and displayed
information (all system displays) workshops
County Preliminary
Acceptance
Complete tenant gate operational functionality
(i.e. boarding sequence, etc.) workshops
County Preliminary
Acceptance
Complete airline functional workshop with all
airlines
County Preliminary
Acceptance
Complete airline technical (individual per
airline) workshops for all stage one DAPP and
CUSS airlines*
County Preliminary
Acceptance
Complete Resource Management System
preliminary functionality workshops
County Preliminary
Acceptance
Complete AIMS preliminary reporting
requirements workshops
County Preliminary
Acceptance
Complete other workshops as required
Comentarios a estos manuales