AIMS Attachment A: AIMS Statement of Work
Page 123 of 130
1. Operator equipment associated with system.
2. End devices and displays associated with system.
3. Software associated with system.
4. Administrative console equipment.
5. Sufficient signal transmission media (STM) and associated equipment
and accessories to provide a fully integrated system model. Include at
least one of each type STM circuit.
6. Number of field processors required for system to be installed at site.
7. Enough load and data simulators to provide simulation of full load
operational conditions as required by design. Loads shall be manually
or software generated.
B. Preparation: Ensure that development of system is complete, required
approvals of submittals have been obtained, and sufficient equipment
procured to completely demonstrate and test system. Schedule FAT with
County Project Manager at least 45 calendar days prior to test:
C. Time: Conduct during County Work Day.
D. Location: FLL test lab.
E. Test: The purpose is to test the complete computer software package and
equipment of the system and demonstrate that all specified features and
performance criteria are met. All requirements of the specification shall be
tested including, but not limited to:
1. Functionality including reporting and response.
2. System capacity.
3. Hardware interaction.
4. Hardware and software interaction.
5. Demonstrate report generation.
F. Acceptance: Acceptance of system to perform sufficiently and provide
specified functions shall be determined by the County representatives
witnessing the Factory Acceptance Test.
1. Acceptance Criteria: Performance of system shall equal or exceed
criteria stated in individual specification sections.
2. If system does not perform satisfactorily, the CONTRACTOR shall
make corrections and modifications and schedule new test with the
Exhibit 3
Page 183 of 278