Unimark EC3000 Series Especificaciones Pagina 177

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 278
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 176
AIMS Attachment A: AIMS Statement of Work
Page 117 of 130
5. Aircraft type(s).
6. For the EVIDS AFD and HFD reports, the user shall be able to specify
the sort order for the report. The default sort order, if not specified by
the user, shall be by ascending airline code and flight number. The
user shall be able to specify multiple sorting fields, including but not
limited to the following fields:
i Assigned gate.
ii Assigned baggage carousel.
iii County name.
iv Airline.
v Flight number.
C. Gate Utilization Report: The system shall provide a Gate Utilization Report
which shall list, for each selected gate, the flights utilizing that gate
throughout the defined time period. For this report, the user can specify
the reporting criteria based on the following:
1. Gate(s), default is all gates if not specified.
2. Starting time period, default is 12:01 a.m.
3. Ending time period, default is 12:00 a.m.
D. Video Advertising Report: The system shall provide a report detailing
the tracking information for the display of video advertising files. The
report shall include the time, length, the display monitor that was used for
all advertisements, and a summary of the number of times each video was
played on each monitor as well as the total number of times each video
was played in a given time period throughout the airport.
E. The initial reporting requirements for EVIDS shall be fully defined during
the stakeholder workshops. The base system shall provide up to fifteen
(15) canned reports to be defined during this process.
3.11.4 Resource Management System Reports
A. The initial reporting requirements of the RMS shall be defined during the
stakeholder workshops. The base system shall provide up to fifteen (15)
canned reports to be defined during this process.
3.11.5 Common Use Passenger Processing Reports
A. The initial reporting requirements of the DAPP shall be defined during the
stakeholder workshops. The base system shall provide up to fifteen (15)
canned reports to be defined during this process.
Exhibit 3
Page 177 of 278
Vista de pagina 176
1 2 ... 172 173 174 175 176 177 178 179 180 181 182 ... 277 278

Comentarios a estos manuales

Sin comentarios