AIMS Attachment A: AIMS Statement of Work
Page 120 of 130
B. The CONTRACTOR shall install and inspect all hardware required in this
specification in accordance with the manufacturer's installation
instructions. Final placement of hardware is subject to the County‟s
approval.
C. The CONTRACTOR shall be responsible for any and all loss or damage in
the shipment and delivery of all material until transfer of title to the County.
D. The CONTRACTOR shall obtain written permission from the County
before proceeding with any work which requires cutting into or through any
part of the building structures such as, but not limited to, girders, beams,
concrete, carpeted or tiled floors, partitions or ceilings. The
CONTRACTOR shall obtain written permission from the County before
cutting into or through any part of the building structures where
fireproofing or moisture proofing could be impaired. In any such case the
CONTRACTOR shall be responsible for restoring the affected area to
“like-new” condition or to a condition to match the existing conditions.
E. The CONTRACTOR shall take all steps necessary to ensure that all public
areas remain clear or are properly marked during installation or
maintenance.
F. The CONTRACTOR shall coordinate installation with the County, to
minimize disruption of existing business functions at the Airport.
G. The CONTRACTOR shall place materials only in those locations that have
been previously approved. Any other locations shall be approved, in
writing, by the County.
H. The CONTRACTOR shall label all cabling and patch cords in accordance
with the BCAD approved labeling plan. Coordination with the County shall
be performed, and all labeling shall be approved, prior to implementation.
4.1.4 System Startup
A. The CONTRACTOR shall not apply power to the system until after:
1. System and components have been installed and inspected in
accordance with the manufacturer's installation instructions.
2. A visual inspection of the system components has been conducted to
ensure that defective equipment items have not been installed and that
there are no loose connections.
3. System wiring has been tested and verified as correctly connected as
indicated.
4. All system grounding and transient protection systems have been
verified as properly installed and connected, as indicated.
Exhibit 3
Page 180 of 278