AIMS Attachment A: AIMS Statement of Work
Page 31 of 130
recognized. Issue the revised schedule concurrently with the minutes
of each Progress Meeting.
E. Coordination Meetings
1. From time to time, there may be need of either the County or the
CONTRACTOR to call for a Coordination Meeting.
2. Coordination Meetings may be required by either of the parties.
3. Attendees shall as determined by the County and/or CONTRACTOR.
4. The meeting agenda shall be determined by the County and/or
CONTRACTOR.
5. No later than three (3) County Work Days after each Coordination
Meeting, the County or CONTRACTOR shall distribute minutes of the
meeting to each party present and to other parties as considered
appropriate. Included will be a brief summary, in narrative form, of the
meeting. The minutes will be reviewed and commented on by the all of
the meeting attendees within two (2) County Work Days. The
comments are to be incorporated by the CONTRACTOR and then the
meeting minutes shall be distributed to the meeting attendees in their
final form.
2.1.6 Use Of Premises
A. General Information
1. CONTRACTOR shall use the delivery route and staging area identified
by County.
2. Portions of the Airport beyond the work areas of this project are not to
be disturbed. CONTRACTOR shall conform to site rules and
regulations affecting the work while engaged in the project.
3. CONTRACTOR shall keep existing driveways, roads and entrances
serving the premises clear and available to traffic at all times. These
areas are not to be used for CONTRACTOR vehicle parking or storage
of material.
4. CONTRACTOR shall take all precautions necessary to protect premise
buildings, premise occupants, and personnel from injury or damage.
5. The staging areas to be used by the CONTRACTOR on-Airport shall
be as specified by the County. Additional staging area/storage space
needs to be coordinated with the County on an as-needed basis.
6. CONTRACTOR shall establish and initiate use of temporary facilities at
the time first required for proper performance of the work.
Exhibit 3