Unimark EC3000 Series Especificaciones Pagina 65

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 278
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 64
AIMS Attachment A: AIMS Statement of Work
Page 5 of 130
The CONTRACTOR shall be responsible for close coordination with the County‟s
staff to complete all necessary configuration and integration with the existing
Nortel VoIP telephony system to ensure the system is properly configured to
support the AIMS. All requested modifications to the VoIP system must be
submitted in writing for approval by the County.
The CONTRACTOR shall be responsible for performing all necessary
coordination with airline representatives and County to ensure each airline‟s
DAPP peripheral requirements are met by the AIMS.
The CONTRACTOR shall be responsible for coordinating with the County to set
up a test/training lab on the premises (location to be determined by County) to
facilitate training, system configuration, testing, and deployment. This lab will be
used by the County post implementation to support system administration and
modifications.
The CONTRACTOR shall be responsible for providing eleven (11) new ticket
counter double inserts. The CONTRACTOR shall ensure that all new equipment
provided by AIMS will be accommodated within the existing millwork at the ticket
and gate counters. The CONTRACTOR shall be responsible for performing the
appropriate coordination with the County, the project manager, and other
construction package coordinators to ensure the new and existing counter inserts
will be accommodated by the counter millwork and other architectural elements
that will be provided by others. As a minimum, the CONTRACTOR shall perform
shop drawing reviews and provide component drawings detailing the exact
mounting requirements for each component and device to be supplied by the
Contract Documents.
The CONTRACTOR shall be responsible for analyzing and integrating all existing
display devices into the AIMS. This shall include all necessary hardware,
software, and interface components necessary to allow the AIMS to display
information on the existing display devices. All existing devices must also be
supported during the initial warranty period, post warranty maintenance period,
and any optional maintenance period(s). A listing of the existing EVIDS
equipment is provided in Exhibit B-1.
The CONTRACTOR shall be responsible for performing all necessary
coordination, including attendance at weekly construction meetings, with other
related County projects.
The CONTRACTOR shall be responsible for participating in all County safety
programs and adhering to the established safety guidelines.
The CONTRACTOR shall be responsible for providing all warranty and
maintenance related work.
Exhibit 3
Page 65 of 278
Vista de pagina 64
1 2 ... 60 61 62 63 64 65 66 67 68 69 70 ... 277 278

Comentarios a estos manuales

Sin comentarios