Unimark EC3000 Series Especificaciones Pagina 131

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 278
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 130
AIMS Attachment A: AIMS Statement of Work
Page 71 of 130
8. Avianca
9. Bahamas Air
10. CanJet
11. Caribbean
12. Chalks (commuter)
13. Comair
14. Continental
15. Continental Connection (Gulfstream)
16. Delta/Delta Connection
17. Frontier
18. JetBlue
19. Lynx Air International (commuter)
20. Northwest/KLM
21. Skyservice
22. Southwest
23. Spirit
24. Sunwing
25. US Airways
26. Westjet
27. Yellow Air Taxi (commuter)
3.5.3 DAPP Performance Requirements
A. In addition to the performance requirements listed in Section 3.10, the
DAPP shall conform to the following:
1. DAPP Latency: The time from when a DAPP position (and any
associated CUSS position) is assigned to an airline via the RMS
interface and the position is fully operational for passenger processing
shall not be more than three (3) minutes.
2. In Line CUSS: For an in-line CUSS kiosk, the time from when an
airline is selected for self-service check-in and the selected self-service
check-in application is fully operational for use shall not be more than
ten (10) seconds. A “loading” or other similar screen shall be
displayed within 1.0 seconds after the airline is selected.
3.5.4 DAPP Hardware Requirements
A. The DAPP shall meet the requirements outlined in Section 3.9
B. Refer to drawings for hardware types and quantities.
C. In addition to the components shown on the drawings, the CONTRACTOR
shall provide five (5) DAPP workstations to be used in baggage offices.
The location of these devices shall be coordinated with the County.
Exhibit 3
Page 131 of 278
Vista de pagina 130
1 2 ... 126 127 128 129 130 131 132 133 134 135 136 ... 277 278

Comentarios a estos manuales

Sin comentarios