AIMS Attachment A: AIMS Statement of Work
Page 38 of 130
2.3.5 Quality Control Procedures - This is a detailed description of quality control
activities for work under each section of the specifications. It includes a list of
all tests, inspections and frequencies, personnel, instructions, checklists,
procedures, and records. CONTRACTOR shall submit descriptions at least
30 calendar days before starting such work.
A. Before the CONTRACTOR‟s Quality Control Plan is submitted, the
CONTRACTOR shall meet with the County and discuss the
CONTRACTOR‟s Quality Control Plan. The meeting shall develop a
mutual understanding of the details of the plan, including the forms to be
used for recording the quality control operations, inspections,
administration of the plan for both on-site and off-site work, and the
interrelationship of CONTRACTOR and County inspections. The
CONTRACTOR shall prepare minutes of the meeting which shall be
incorporated in the CONTRACTOR‟s Quality Control Plan.
B. Unless specifically authorized by the County, no construction or off-site
fabrication shall be started until the CONTRACTOR‟s entire Quality
Control Plan is approved. Construction of any feature of the work will only
be permitted after approval of the Quality Control Plan, or at least approval
of that portion of the plan applicable to the specific feature of the work. At
the election of the County, no request for payment will be processed until
the entire Quality Control Plan has been approved.
C. If the County determines that the Quality Control Plan, personnel,
inspections, tests, or records are not adequate, corrective actions shall be
taken immediately as appropriate to cure the problem.
D. The CONTRACTOR shall notify the County in writing of any proposed
change to the CONTRACTOR‟s Quality Control Plan; no such change
shall be implemented prior to approval in writing by the County.
E. Implementation of the Quality Control Plan is the responsibility of the
CONTRACTOR. This implementation will be closely monitored by the
County and deficiencies therein will be corrected by or at the expense of
the CONTRACTOR.
2.3.6 Requirements and Standards
A. All Hardware, Equipment, Software, Goods, firmware, and operating
system requirements stated in the Contract Documents are the minimum
requirements. The CONTRACTOR's product shall meet or exceed such
requirements.
B. Equipment and materials shall be standard products of manufacturer(s)
regularly engaged in the manufacture of Equipment specified herein and
shall be the manufacturer‟s latest standard design.