AIMS Attachment A: AIMS Statement of Work
Page 14 of 130
Existing EVIDS in Terminal One cut over to new
system.
Existing EVIDS in Terminal Two cut over to new
system.
Existing EVIDS in Terminal Three cut over to new
system.
Existing EVIDS in Terminal Four cut over to new
system.
New EVIDS Displays installed, configured, and
tested.
Configuration of all DAPP Stage One Airlines
Configuration of all CUSS Stage One Airlines
DAPP Training Complete (Stage One Airlines)
Installation, configuration, and testing of DAPP
end user devices
Installation, configuration, and testing of CUSS
stations
Installation, configuration, and testing of AODB
including third party feed
Installation, configuration, and testing of RMS
and associated end user devices
Provide Deliverables associated with Phase Two
including the following:
Review against
specifications
Provide finalized parts lists and breakdowns that
identify each hardware component (to the lowest
repairable unit) for the AIMS
Review against
specifications
Provide finalized spare parts list for the AIMS
Review against
specifications
Provide finalized as-built drawings for the AIMS
Review against
specifications and
field verification
Provide finalized user documentation for the
AIMS
Review against
specifications
Provide finalized response escalation plan for the
AIMS
Review against
specifications
Provide finalized COTS (common off-the-shelf)
software report and license information for the
AIMS
Review against
specifications and
field verification
Provide finalized maintenance schedule for the
AIMS
Review against
specifications
Provide finalized disaster recovery plan for the
AIMS
Review against
specifications
Provide required software backup copies for the
AIMS
Review against
specifications and