AIMS Attachment A: AIMS Statement of Work
Page 14 of 130
documents
202
Existing EVIDS in Terminal One cut over to new
system.
Field Verification
203
Existing EVIDS in Terminal Two cut over to new
system.
Field Verification
204
Existing EVIDS in Terminal Three cut over to new
system.
Field Verification
205
Existing EVIDS in Terminal Four cut over to new
system.
Field Verification
206
New EVIDS Displays installed, configured, and
tested.
Field Verification
207
Configuration of all DAPP Stage One Airlines
Field Verification
208
Configuration of all CUSS Stage One Airlines
Field Verification
209
DAPP Training Complete (Stage One Airlines)
Field Verification
210
Installation, configuration, and testing of DAPP
end user devices
Field Verification
211
Installation, configuration, and testing of CUSS
stations
Field Verification
212
Installation, configuration, and testing of AODB
including third party feed
Field Verification
213
Installation, configuration, and testing of RMS
and associated end user devices
Field Verification
214
Provide Deliverables associated with Phase Two
including the following:
Review against
specifications
214.1
Provide finalized parts lists and breakdowns that
identify each hardware component (to the lowest
repairable unit) for the AIMS
Review against
specifications
214.2
Provide finalized spare parts list for the AIMS
Review against
specifications
214.3
Provide finalized as-built drawings for the AIMS
Review against
specifications and
field verification
214.4
Provide finalized user documentation for the
AIMS
Review against
specifications
214.5
Provide finalized response escalation plan for the
AIMS
Review against
specifications
214.6
Provide finalized COTS (common off-the-shelf)
software report and license information for the
AIMS
Review against
specifications and
field verification
214.7
Provide finalized maintenance schedule for the
AIMS
Review against
specifications
214.8
Provide finalized disaster recovery plan for the
AIMS
Review against
specifications
214.9
Provide required software backup copies for the
AIMS
Review against
specifications and
Exhibit 3
Page 74 of 278