AIMS Attachment A: AIMS Statement of Work
Page 4 of 130
Thorough review, analysis, and acceptance of existing systems, software,
and components that will be utilized by, or integrated with the AIMS.
The CONTRACTOR shall provide the following components:
All software and hardware components necessary for the AIMS to function
as specified.
All patch cords required to connect to the campus-wide Premises
Distribution System (PDS) and to interconnect AIMS components.
Uninterruptible Power Supplies (UPS) for all servers.
System training as specified.
System warranty as specified.
System testing and acceptance plans as specified.
The installed AIMS and all components shall be compliant with the most current
Payment Card Industry (PCI) Data Security Standard and Payment Application
Data Security Standard‟s at the time of installation.
The CONTRACTOR shall be responsible for all data level integration and
interfaces as identified in this document. To support these interfaces and
integration, Interface Design Documents (IDD) shall be developed by the
CONTRACTOR for each identified interface. The IDDs shall be submitted and
approved prior to proceeding with any integration work.
The CONTRACTOR shall be responsible for performing all documentation
reviews, field audits, inspections, and other methods necessary for analyzing the
existing conditions of infrastructure (power, cabling, and Local Area Network),
systems, software, and components that are to be utilized by, or integrated with
the new AIMS. The CONTRACTOR shall submit a formal deliverable stating that
the existing conditions are acceptable, or detailing any required modifications to
existing conditions that will be necessary for the AIMS to function as specified.
The CONTRACTOR shall be responsible for closely coordinating with County‟s
network administration staff to complete all necessary configuration and
integration with the LAN system to ensure the network port and Virtual Local
Area Network (VLAN) requirements of the PDS are properly configured to
support the AIMS. The County‟s network administration staff will provide all
system architecture and configuration requirements and must approve any LAN
modifications prior to implementation. All requested modifications to the LAN
must be submitted in writing for approval by the County.
The CONTRACTOR shall be responsible for providing any new Local Area
Network equipment that will be required to support the additional end user and
system devices provided by the Contract Documents.