AIMS Attachment A: AIMS Statement of Work
Page 13 of 130
Complete head-end equipment installation
(hardware and operating system(s))
Pre-Installation
Verification
Installation and configuration of test lab
Pre-Installation
Verification
Complete Factory Acceptance Testing including
items listed. Note: FAT for DAPP will
demonstrate LDCS functionality in lieu of
individual stage one DAPP airline interfaces.*
FAT will not include CUSS.
Review against
specifications
Complete CONTRACTOR‟s Quality Assurance
organization review of FAT test procedures
Review against
specifications
Provide finalized FAT test plan/procedures
Review against
specifications
Complete pre-test setup and verification of test
configuration
Conduct and pass all FAT test requirements
and verify documentation
Field Verification
against FAT test plan
(105.1)
Provide finalized FAT test report
Review against
specifications
Receive Contract Administrator's written
Preliminary Acceptance of Phase One
*Refer to Section 1.6.5 of this Statement of Work for a listing of airlines associated
with each DAPP and CUSS stage
1.6.3 Phase Two
AIMS configured to accommodate all EVIDS
functionality and complete deployment of all
components required to support the existing
EVIDS and associated infrastructure
coordination, including the items listed.
All inputs to EVIDS through the new AIMS;
interface to existing EVIDS (Infax) complete.
County Preliminary
Acceptance
All existing EVIDS displays driven by new
AIMS
Interface to Infax system complete
Airline feeds for Delta, Southwest, and
American complete
All screen layouts complete
Review against
workshop design