
AIMS Attachment A: AIMS Statement of Work
Page 80 of 130
B. Ticket Module: The RMS shall have an expandable module for planning /
scheduling and real-time management of Ticket Counter and Re-check
Counter allocation.
1. The Ticket Module shall provide an integrated planning function and
real-time allocation function for assignment of ticket counters (i.e.,
main ticket counters, recheck-in counters, etc.) to specific carriers.
2. The module shall be able to manage a minimum of 400 ticket counter
positions.
3. The Ticket Module shall aid in the planning of seasonal ticket counter
assignments for a minimum of up to two (2) years in advance. The
ticket planning shall occur off-line. The ability to save changes off-line
and to upload changes into the on-line database shall be provided.
4. The Ticket Module planning function shall allow for
planning/scheduling off-line.
5. The real-time function shall actively respond to changes in flight data,
equipment failures, etc. by providing warnings and/or
recommendations to the operator.
C. Bag Makeup Module: The RMS shall include a module for planning /
scheduling and real-time management of Bag Makeup carousel allocation.
1. The Bag Makeup Module shall provide an integrated planning function
and real-time function for the assignment of flights to baggage makeup
carousels.
2. The module shall be able to manage a minimum of 40 makeup
carousels.
3. The Bag Makeup Module shall aid Baggage Handling System (BHS)
personnel in efficiently („optimally‟) allocating flights to baggage
makeup carousels to ensure balanced bag loads on each carousel.
4. The module shall be capable of both advanced planning and real-time
adjustments to compensate for changes in flight schedules, etc.
5. The Bag Makeup Module shall aid in the planning of seasonal bag
makeup carousel assignments for a minimum of up to two (2) years in
advance. The planning shall occur off-line. The ability to save
changes off-line and to upload changes into the on-line database shall
be provided.
D. Bag Breakdown Module: The RMS shall have an expandable module for
planning / scheduling and fully automatic real-time management of Bag
Breakdown pier allocation.
Exhibit 3
Page 140 of 278
Comentarios a estos manuales