AIMS Attachment A: AIMS Statement of Work
Page 41 of 130
2. Remove pavement stains and other foreign deposits.
B. CONTRACTOR shall clean and remove from site all surplus and
discarded materials, temporary security fencing, and debris of every kind.
CONTRACTOR shall leave site of the work in a neat and orderly
condition. Surplus and waste materials shall be removed from the site of
the work. Waste and debris shall be disposed of in an approved disposal
area off-Airport satisfactory to the County.
C. CONTRACTOR shall remove temporary labels, stains, and foreign
substances from all installed materials.
D. Except as otherwise indicated or requested by the County,
CONTRACTOR shall remove temporary protecting devices and facilities
installed during the course of the work.
E. CONTRACTOR shall comply with safety standards and governing
regulations for cleaning operations. CONTRACTOR shall not burn waste
materials at site, or bury debris or excess materials on the County‟s
property, or discharge volatile or other harmful or dangerous materials into
drainage systems. CONTRACTOR shall remove waste materials from site
and dispose of in a lawful manner at the expense of the CONTRACTOR.
2.4.3 Project Record Documents
A. CONTRACTOR will provide record documentation to the County at the
completion of each phased installation and prior to Final Acceptance. To
ensure that this submittal reflects proper record keeping by the
CONTRACTOR during the course of the work, CONTRACTOR shall
maintain on-site one (1) set of the Contract drawings, specifications,
addenda, change orders and other modifications to the Contract
Documents, and reviewed shop drawings and product data.
B. CONTRACTOR shall legibly mark and record at each specification section
a description of actual products installed, including the manufacturer‟s
name and product model number, product substitutions or alternates
approved and utilized, and changes made by Change Orders or Contract
amendments.
C. CONTRACTOR shall legibly mark record documents and shop drawings
to record actual construction including communication conduit, cabling and
pathways used, field changes of dimensions and detail, changes in details
from those indicated on drawings, details not on original Contract
drawings, and provide make and model of actual product installed.
D. CONTRACTOR shall mark whichever drawing is most appropriate to
showing “field” conditions fully and accurately. If necessary,
Exhibit 3
Page 101 of 278